怎么保證石膏粉的施工完好?
來源:http://www.man5g.cn 日期:2019-02-12 發布人:
想保證石膏粉施工的完好,要嚴格按照執行標準來操作。對于石膏粉施工執行標準,我們也整理了一些信息。
In order to ensure the completion of gypsum powder construction, it is necessary to strictly follow the implementation standards. For the implementation standard of gypsum powder construction, we also collated some information.
首先,脫硫石膏粉生產設備施工前對基層的處理是極有必要的,要確保基層平整,如有凹凸不平處需及時處理;根據基層墻面的吸水率進行濕潤,待表面無浮水再進行抹灰施工。
First of all, it is very necessary to treat the base before the construction of desulfurization gypsum powder production equipment. It is necessary to ensure the level of the base, if there are bumps, to deal with them in time; wet the base wall according to the water absorption rate, and then plaster the surface without floating water.
用石膏粉配制的砂漿的抹灰工藝與傳統抹灰工藝相同,需要按規定掛線,找規矩進行墻面抹灰。石膏粉的具體施工方法如下所述:
The plastering process of mortar prepared with gypsum powder is the same as that of traditional plastering process. It needs to hang wires according to the regulations and find rules for wall plastering. The concrete construction method of gypsum powder is as follows:
1根據設計要求、工程造價等實際情況來選擇底層砂漿配合比,然后進行墻面抹灰。
1. Select the mix proportion of bottom mortar according to the design requirements, engineering cost and other actual conditions, and then carry out wall plastering.
2按傳統工藝對內墻及頂棚進行抹灰刮糙,依據標志及標筋用刮杠刮平,后用木砂板搓平壓實。
2. According to the traditional technology, plastering and scraping the interior wall and ceiling, scraping with scraper according to the sign and reinforcement, and finally rubbing and compacting with wood sand board.


3脫硫石膏粉生產設備可采用凈漿或混合料漿作為面層抹灰材料,用水量要以適應氣候條件、便于施工為宜。拌灰量要適宜,確保當天能用完,避免造成浪費。在底層砂漿差不多七八成干時進行面層抹灰,用鐵板壓實壓光。
3. Clean slurry or mixed slurry can be used as surface plastering material for desulfurization gypsum powder production equipment. The water consumption should be adapted to climatic conditions and convenient for construction. The amount of ash mixing should be appropriate to ensure that it can be used up on the same day, so as to avoid waste. When the bottom mortar is about 78% dry, the surface is plastered and compacted with iron plate.
4等面層抹完12-24小時后,用細砂紙將表面紋路抹平,再用濕布擦洗一遍便可達到中高級抹灰標準。
4. After 12-24 hours of plastering, the surface lines are smoothed with fine sandpaper, and then scrubbed with a wet cloth to reach the intermediate and advanced plastering standards.
今天的內容就先為大家介紹到這里了,如果您有濟南石膏粉的其它疑問,歡迎您點擊我們的官網進行咨詢:http://www.man5g.cn/
Today's content is introduced here. If you have any other questions about Jinan gypsum powder, you are welcome to click on our official website for consultation: http://www.man5g.cn./
主站蜘蛛池模板:
成人小说一区二区中文在线|
妇女bbbb插插插视频|
国产情侣激情在线对白|
国产中文字幕精品在线|
国产精品久久久|
自拍偷拍亚洲天堂|
国产熟女自拍露脸|
国产综合色产在线精品|
潮喷失禁大喷水无码|
久久精品国产只有精品66|
精品人妻大屁股白浆无码|
最新2020无码中文字幕在线视频|
澡人妻AV|
国产va免费精品观看精品|
亚洲日韩欧美一区二区三区|
婷婷99|
久久精品6|
激情综合av|
国产男人天堂|
中文字幕日本在线视频二区|
午夜视频福利在线|
精品国产AⅤ一区二区三区V免费
|
克拉玛依市|
www.国产在线观看|
国产精品三级片一区|
www.亚洲成人|
国产精品国产三级在线高清观看|
亚洲欧美日韩高清一区二区三区
|
久久国产成人亚洲精品影院老金|
人妻夜夜爽天天爽一区|
大香蕉伊利人75伊利人|
亚洲精品粉嫩小泬50P|
欧美在线视频a|
日韩?人妻?无码?制服|
久久日韩在线观看视频|
妇女bbbbb撒尿正面视频|
9191久久|
人妻洗澡被强公日日澡电影
|
亚洲免费v片|
精品人妻一区二区三区日产乱码|
人人干超碰|

魯公網安備